Illustrative image
Atlas 2026 ·
Waste-to-energy plant (UVE): definition and map of the 116 sites in France
A waste-to-energy plant (UVE, unité de valorisation énergétique) burns residual household waste, the part that cannot be recycled, and recovers the heat of combustion to produce steam, electricity or heat for a district heating network.
As of 12 October 2026, France has 116 plants in operation, for 14.6 Mt of declared capacity per year. Veolia and Suez operate 64. 54 projects are under way, and 26 operating contracts change hands by 2028.
116
plants in operation, 115 with dated evidence
14,6Mt/yr
of declared capacity
54
projects, including 18 under construction
26
contracts at stake from 2026 to 2028
What has changed
Updated every month. Last update: .
Tronville-en-Barrois (55) · Usine fermée en 2024 : retirée de l'Atlas, qui compte 116 UVE en service · source
Brest (29) · Rattachée à Dalkia : Eco Chaleur de Brest (Dalkia 51 %) conduit l'usine pour la SPL Sotraval · source
Toulon (83) · Classée en coentreprise : Zephire, Pizzorno-Paprec 51 % et Idex 49 % · source
Chaumont (52) · Concession attribuée à Paprec Énergies Nord, exploitation au 1er novembre 2026 (Veolia sortant) · source
La Veuve (51) · Concession Syvalom attribuée à FCC Environnement, début prévu le 2 août 2026 (Veolia sortant) · source
Labeuvrière (62) · Idex reprend l'exploitation le 12 juin 2026, ancienne usine jusqu'en avril 2027 avant le nouveau CVE · source
Plouharnel (56) · Retiré des projets : il s'agit d'une station de transfert, pas d'une UVE
01 · Definition
The terms
UVE, UIOM, SRF: what the acronyms mean
A UVE, an incinerator and a UIOM are the same plant. The difference lies in the energy recovered, measured by the R1 criterion of the EU Waste Framework Directive.
- EfW
- A waste-to-energy plant (UVE, unité de valorisation énergétique) burns residual household waste, the part that cannot be recycled, and recovers the heat of combustion to produce steam, electricity or heat for a district heating network.
- UIOM
- Household waste incineration plant: the former name of the same installation. It is called a UVE when energy is recovered and the plant reaches the energy efficiency threshold of the EU Waste Framework Directive (R1 criterion).
- R1 criterion
- Formula in Annex II of Directive 2008/98/EC: a plant is classed as recovery, not disposal, if its energy efficiency reaches 0.65 (0.60 for plants permitted before 2009).
- SRF
- Solid recovered fuel: the part of sorting rejects that burns well, prepared for a dedicated boiler, usually at an industrial site that needs steam.
- CVE
- Energy recovery centre: the name several local authorities give their UVE. Same installation.
02 · The map
116 plants, 54 projects, 5 SRF boiler plants
The map of waste-to-energy plants in France
Tap an operator to show only its plants. Every point was checked on the evidence: environmental inspection, procurement notice, business register.
03 · The operators
Who runs the plants
Veolia and Suez: 57% of capacity
The local authority almost always owns the plant. It contracts out operation through a concession or a service contract, for 7 to 28 years, or runs it in-house.
| Operator | Plants | Declared capacity | Share of capacity |
|---|---|---|---|
| Veolia | 33 | 3,9 Mt | 27 % |
| Suez | 31 | 4,4 Mt | 30 % |
| Paprec | 21 | 1,7 Mt | 12 % |
| Régie publique | 7 | 0,8 Mt | 6 % |
| Idex | 7 | 0,7 Mt | 5 % |
| Urbaser | 4 | 1,7 Mt | 11 % |
| SPL, SEM | 4 | 0,5 Mt | 4 % |
| Séché | 3 | 0,2 Mt | 1 % |
| Engie | 3 | 0,1 Mt | 1 % |
| Autres exploitants | 2 | 0,4 Mt | 3 % |
| Dalkia | 1 | 0,1 Mt | 1 % |
04 · The 116 sites
The full list
The 116 plants region by region
Capacity in thousand tonnes per year (kt), as declared. Contract end: end of the current operating contract; “around” when deduced from the contract term.
| Plant | Dept. | Operator | Capacity | Management | Contract end |
|---|---|---|---|---|---|
| Auvergne-Rhône-Alpes · 14 plants · 1,5 Mt | |||||
| ValserhôneSivalor | 01 | SuezSET Faucigny Genevois (Suez RV Energie) | 125 kt | Marché d’exploitation | 2027 |
| BayetSictom Sud Allier | 03 | VeoliaLucane | 74 kt | Concession (DSP) | 2027 |
| Bourgoin-JallieuSitom Nord Isère | 38 | Veolia | 198 kt | Marché d’exploitation | 2033 |
| La TroncheGrenoble Alpes Métropole | 38 | SPL, SEMCCIAG (SEM), marché du 01/05/2026 | 185 kt | SPL ou SEM | 2031 |
| PontcharraSibrecsa | 38 | IdexIdex Environnement | 20 kt | Concession (DSP) | 2026 |
| Clermont-FerrandValtom | 63 | SuezVernéa (SASU) | 150 kt | Concession (DSP) | 2033 |
| Lyon | 69 | Régie publiqueMétropole de Lyon (régie) | 270 kt | Régie | Régie, nouvelle usine 2033 |
| Rillieux-la-PapeGrand Lyon | 69 | SuezNeovaly (ex-Valorly) | n.c. | Marché d’exploitation | 2027 |
| Villefranche-sur-SaôneSytraival | 69 | PaprecCideme Paprec Énergie Centre Est | 88 kt | Marché d’exploitation | 2030 |
| ChambérySavoie-Déchets | 73 | Régie publiqueSavoie Déchets (régie) | 120 kt | Régie | Non publiée |
| ChavanodSila | 74 | IdexIdex Environnement, nouveau marché au 01/01/2027 (BOAMP 26-22562) | 96 kt | Marché d’exploitation | 2034 |
| MarignierSivom Région Cluses | 74 | VeoliaArvalia | 42 kt | Marché d’exploitation | 2033 |
| PassySitom Vallées Mont-Blanc | 74 | SuezSET Mont-Blanc (Novergie Centre-Est) | 60 kt | Marché d’exploitation | Non publiée |
| Thonon-les-BainsStoc | 74 | IdexIdex Environnement | 43 kt | Marché d’exploitation | Non publiée |
| Bourgogne-Franche-Comté · 9 plants · 0,5 Mt | |||||
| Dijon | 21 | Régie publiqueDijon Métropole (régie directe) | 140 kt | Régie | Non publiée |
| Besançon | 25 | EngieValaxion (dirigeants communs avec SOCCRAM, Engie Solutions) | 42 kt | Marché d’exploitation | 2028 |
| Montbéliard | 25 | VeoliaValinea | 32 kt | Concession (DSP) | 2040 |
| Pontarlier | 25 | SuezSuez RV Energie / Suez RV Centre Est | 38 kt | Marché d’exploitation | 2028 |
| Lons-le-Saunier | 39 | VeoliaJuralia | 41 kt | Marché d’exploitation | 2026 |
| Fourchambault | 58 | VeoliaSonirval Energie | 46 kt | Concession (DSP) | 2031 |
| Noidans-le-Ferroux | 70 | SuezSuez RV Energie | 41 kt | Marché d’exploitation | 2027 |
| Sens | 89 | VeoliaValest | 24 kt | Marché d’exploitation | Non publiée |
| Bourogne | 90 | Régie publiqueSERTRID (régie) | 85 kt | Régie | Non publiée |
| Brittany · 10 plants · 0,6 Mt | |||||
| Lamballe-ArmorPlanguenoual | 22 | SuezSuez (fiche Kerval, exploitant Suez Environnement) | 48 kt | Marché d’exploitation | Non publiée |
| Pluzunet | 22 | PaprecPaprec (ex-CNIM Ouest Armor) | 59 kt | Marché d’exploitation | Non publiée |
| Taden | 22 | SuezDewen | 106 kt | Concession (DSP) | 2043 |
| Brest | 29 | DalkiaEco Chaleur de Brest (Dalkia 51 %, Sotraval 49 %), pour Sotraval (SPL, titulaire ICPE) | 146 kt | SPL ou SEM | 2029 |
| Briec | 29 | VeoliaGéval (Géval Ouest - Briec) | 67 kt | Marché d’exploitation | 2027 |
| Carhaix-Plouguer | 29 | SuezSuez RV Energie | 33 kt | Marché d’exploitation | 2032 |
| Concarneau | 29 | VeoliaGéval (Veolia), marché du 01/10/2026 | 58 kt | Marché d’exploitation | 2033 |
| Rennes | 35 | VeoliaValoReizh (Veolia), usine à l'arrêt depuis 2023 | n.c. | Concession (DSP) | Non publiée |
| Vitré | 35 | PaprecPaprec Grand-Ouest (UVE de Vitré) | 28 kt | Concession (DSP) | Non publiée |
| Pontivy | 56 | PaprecCyclergie (Paprec Energies) | 34 kt | Marché d’exploitation | 2035 |
| Centre-Val de Loire · 9 plants · 0,7 Mt | |||||
| MainvilliersChartres Métropole | 28 | SPL, SEMSPL C'Chartres Traitement et Valorisation (C'CTV) | 110 kt | SPL ou SEM | Non publiée |
| Ouarville | 28 | SuezUVEA (Suez Recyclage & Valorisation) | 135 kt | Concession (DSP) | 2027 |
| Saint-Benoît-la-ForêtChinon | 37 | PaprecPaprec Energies Opérations (UIOM de Chinon) | 23 kt | Marché d’exploitation | Non publiée |
| Blois | 41 | SuezValcante | 96 kt | Concession (DSP) | 2040 |
| Vernou-en-Sologne | 41 | Régie publiqueSIEOM du groupement de Mer | 13 kt | Régie | Non publiée |
| Amilly | 45 | SuezSuez RV Energie (Novergie Centre) | 28 kt | Concession (DSP) | 2033 |
| Gien | 45 | Paprec | 78 kt | Concession (DSP) | 2034 |
| Pithiviers | 45 | PaprecPaprec Energies Opération (ex Inova Opérations) | 64 kt | Concession (DSP) | 2027 |
| SaranOrléans | 45 | VeoliaTrisalid | 115 kt | Concession (DSP) | 2029 |
| Grand Est · 11 plants · 0,8 Mt | |||||
| La Chapelle-Saint-LucValaubia | 10 | VeoliaValaubia | 66 kt | Concession (DSP) | 2045 |
| La Veuve | 51 | Autres exploitantsFCC Environnement France, concession du 02/08/2026 | 110 kt | Concession (DSP) | 2036 |
| Reims | 51 | VeoliaRemival | 104 kt | Concession (DSP) | 2026 |
| Chaumont | 52 | PaprecPaprec Energies Nord, concession signée le 16/02/2026 (BOAMP 26-20162), exploitation au 01/11/2026 | 78 kt | Concession (DSP) | 2037 |
| Ludres | 54 | VeoliaVal'ergie (Valest) | 120 kt | Concession (DSP) | 2026 |
| Metz | 57 | Régie publiqueHaganis (régie de l'Eurométropole de Metz) | 120 kt | Régie | Non publiée |
| Schweighouse-sur-ModerHaguenau | 67 | SuezEVNA | n.c. | Concession (DSP) | 2030 |
| Strasbourg | 67 | SéchéSénerval | n.c. | Concession (DSP) | 2030 |
| Colmar | 68 | SPL, SEMSociété Colmarienne de Chauffage Urbain (SCCU) | n.c. | SPL ou SEM | 2028 |
| SausheimMulhouse | 68 | SuezSuez RV Energie (Novergie Est) | 160 kt | Marché d’exploitation | 2027 au plus tard |
| Rambervillers | 88 | SuezFeniix | 86 kt | Concession (DSP) | 2043 |
| Hauts-de-France · 9 plants · 1,4 Mt | |||||
| Douchy-les-Mines | 59 | PaprecPaprec Energies Centre Est (ex-Cideme) | 120 kt | Marché d’exploitation | 2026 |
| Dunkerque | 59 | PaprecPaprec Energies 59 (CVE Biogie) | 95 kt | Concession (DSP) | 2027 |
| HalluinAntarés | 59 | VeoliaCovalys | 355 kt | Concession (DSP) | 2029 |
| Maubeuge | 59 | PaprecPaprec Energies Centre Est | 92 kt | Marché d’exploitation | 2033 |
| Saint-SaulveEcovalor | 59 | PaprecPaprec Energies Centre Est | 140 kt | Marché d’exploitation | 2030 |
| Villers-Saint-PaulIDDEO | 60 | IdexIDDEO | 258 kt | Concession (DSP) | 2042 |
| ArquesFlamoval | 62 | VeoliaValnor | 105 kt | Marché d’exploitation | 2027 |
| Labeuvrière | 62 | IdexIdénergies d'Artois (Idex) depuis le 12/06/2026, ancienne usine jusqu'au 30/04/2027 au plus tard | 120 kt | Concession (DSP) | 2047 |
| Noyelles-sous-Lens | 62 | PaprecPaprec Energie Opérations Noyelles-sous-Lens (ex-Inova Opérations) | 109 kt | Concession (DSP) | 2027 |
| Île-de-France · 18 plants · 4,2 Mt | |||||
| Montereau-Fault-YonneSYTRADEM | 77 | VeoliaGeneris (Veolia), contrat au 01/08/2026 | 72 kt | Concession (DSP) | 2036 |
| MonthyonSMITOM NORD | 77 | VeoliaSomoval (Société Monthyonnaise de Valorisation) | 149 kt | Concession (DSP) | Non publiée |
| Saint-Thibault-des-VignesSIETREM | 77 | PaprecPaprec Énergies (société dédiée de la DSP SIETREM) | 155 kt | Concession (DSP) | 2051 |
| Vaux-le-PénilSMITOM LOMBRIC | 77 | VeoliaGeneris | n.c. | Concession (DSP) | 2040 |
| Carrières-sous-PoissyAZALYS | 78 | SuezHelyseo | 140 kt | Concession (DSP) | 2026, contrat relancé |
| Carrières-sur-SeineSITRU | 78 | SuezCristal Eco Valo | 130 kt | Concession (DSP) | 2030 |
| Thiverval-GrignonSIDOMPE de Plaisir | 78 | PaprecPaprec Énergies Réseau Thiverval-Grignon | 243 kt | Marché d’exploitation | 2029 |
| MassySIMACUR | 91 | EngieEnoris | 87 kt | Concession (DSP) | Non publiée |
| Vert-le-GrandSIREDOM | 91 | SPL, SEMSerivel | 241 kt | SPL ou SEM | 2037 |
| VillejustSIOM | 91 | VeoliaVeolia Recyclage et Valorisation des Déchets (Generis) | 110 kt | Marché d’exploitation | Non publiée |
| Issy-les-MoulineauxIsséane · SYCTOM | 92 | UrbaserIssy Urbaser Énergie | 536 kt | Marché d’exploitation | 2027 |
| Saint-Ouen-sur-SeineSYCTOM | 93 | UrbaserUrbaser Environnement | 650 kt | Marché d’exploitation | 2037 |
| CréteilSMITDUVM | 94 | SuezValo'Marne | 390 kt | Concession (DSP) | 2037 |
| Ivry-sur-SeineSYCTOM | 94 | SuezIvry Paris XIII (IP13) | 730 kt | Marché d’exploitation | 2037 |
| RungisRIVED | 94 | EngieValorgis | n.c. | Marché d’exploitation | 2028 |
| ArgenteuilSyndicat AZUR | 95 | SuezSuez RV Énergie (ex-Novergie) | 206 kt | Concession (DSP) | 2049 |
| Saint-Ouen-l'AumôneCACP | 95 | PaprecCydec (Paprec Île-de-France Cergy) | 160 kt | Concession (DSP) | 2037 |
| SarcellesSIGIDURS | 95 | VeoliaHestia | 170 kt | Marché d’exploitation | 2031 |
| Normandy · 4 plants · 0,8 Mt | |||||
| ColombellesSYVEDAC | 14 | SuezSirac (Suez RV Energie) | 125 kt | Concession (DSP) | 2030 |
| GuichainvilleSETOM | 27 | SuezValoeure | 100 kt | Concession (DSP) | 2031 |
| Le Grand-QuevillySMEDAR | 76 | VeoliaSociété Normande de Valorisation Énergétique (SNVE) | 325 kt | Marché d’exploitation | 2035 |
| Saint-Jean-de-FollevilleSEVEDE | 76 | SuezOréade | 216 kt | Concession (DSP) | 2030 |
| Nouvelle-Aquitaine · 13 plants · 1,1 Mt | |||||
| Échillais | 17 | VeoliaSoval Nord | 74 kt | Concession (DSP) | 2027 |
| La Rochelle | 17 | VeoliaSoval Nord | 65 kt | Marché d’exploitation | 2029 |
| Rosiers-d'Égletons | 19 | SuezCorrèze Energies (ex-Corrèze Incinération) | 43 kt | Concession (DSP) | 2031 |
| Saint-Pantaléon-de-Larche | 19 | VeoliaCorrèze Energies Valorisation (CEV) | 72 kt | Concession (DSP) | 2049 |
| Bègles | 33 | VeoliaValbom | 273 kt | Concession (DSP) | 2027 |
| Cenon | 33 | VeoliaValbom | 138 kt | Concession (DSP) | 2027 |
| Bénesse-Maremne | 40 | Régie publiqueSITCOM Côte Sud des Landes | 91 kt | Régie | Non publiée |
| Pontenx-les-Forges | 40 | PaprecPaprec Energies Atlantique (ex Cyclergie) | 42 kt | Marché d’exploitation | 2030 |
| Le PassageAgen | 47 | SuezSOGAD (coentreprise Suez et Séché) | 35 kt | Concession (DSP) | 2033 |
| Lescar | 64 | UrbaserBéarn Urbaser Energie | 85 kt | Concession (DSP) | 2040 |
| Mourenx | 64 | PaprecPaprec Energy France (marché d'exploitation, possiblement via la société dédiée Semariv) | n.c. | Marché d’exploitation | 2029 |
| Poitiers | 86 | IdexIdex Environnement | 50 kt | Marché d’exploitation | 2029 |
| Limoges | 87 | VeoliaSTVL (Société de traitement et de valorisation des déchets du Limousin) | 110 kt | Marché d’exploitation | 2027 |
| Occitanie · 7 plants · 1,0 Mt | |||||
| NîmesEvolia | 30 | VeoliaEvolia Valo Gard (SASU) | 115 kt | Concession (DSP) | 2034 |
| BessièresDECOSET · Evoneo | 31 | SuezEvoneo | 196 kt | Concession (DSP) | 2045 |
| ToulouseDECOSET · Evoneo | 31 | SuezEvoneo | 330 kt | Concession (DSP) | 2045 |
| Lunel-VielOctav | 34 | SuezOctav (ex Ocreal) | 120 kt | Concession (DSP) | 2032 |
| Sète | 34 | PaprecPaprec Energies Etang de Thau | n.c. | Concession (DSP) | 2042 |
| Calce | 66 | SuezSuez (DSP Sydetom66 au 01/07/2026) | 240 kt | Concession (DSP) | 2038 |
| Montauban | 82 | SéchéMo'UVE | 40 kt | Concession (DSP) | 2040 |
| Pays de la Loire · 5 plants · 0,6 Mt | |||||
| CouëronArc en Ciel 2034 | 44 | VeoliaArc en Ciel 2034 | 100 kt | Marché d’exploitation | 2034 |
| NantesValo'Loire | 44 | SéchéValo'Loire | 170 kt | Concession (DSP) | 2045 |
| Noyant-VillagesLasse Salamandre | 49 | PaprecPaprec Energies 49 | 120 kt | Concession (DSP) | 2050 |
| Pontmain | 53 | SuezCosynergie 53 | 63 kt | Marché d’exploitation | 2034 |
| Le MansSyner'val | 72 | VeoliaSyner'val | 150 kt | Marché d’exploitation | Non publiée |
| Provence-Alpes-Côte d’Azur · 5 plants · 1,4 Mt | |||||
| Antibes | 06 | VeoliaEnea (Veolia), contrat de 12 ans depuis le 27/09/2026 | 160 kt | Concession (DSP) | 2038 |
| NiceArianeo | 06 | VeoliaArianeo | 375 kt | Concession (DSP) | 2041 |
| Fos-sur-MerEvéré | 13 | UrbaserEveRé SAS | 383 kt | Concession (DSP) | Non publiée |
| ToulonZephire | 83 | Autres exploitantsZephire, coentreprise Pizzorno 51 % (Pizzorno contrôlé par Paprec depuis le 09/06/2026) et Idex 49 % | 280 kt | Concession (DSP) | 2030 |
| Vedène | 84 | SuezSuez RV Énergie (ex-Novergie) | 205 kt | Marché d’exploitation | 2027 |
| Overseas · 2 plants · 0,1 Mt | |||||
| Fort-de-France | 972 | IdexMDV (société à actionnaire unique présidée par Idex Environnement), depuis mars 2026 | 115 kt | Concession (DSP) | 2041 |
| Saint-Barthélemy | 977 | PaprecOuanalao Environnement | 9 kt | Concession (DSP) | 2028 |
The 116 plant profiles, the regional maps and the sources are in the PDF Atlas (47 pages), free.
05 · The contracts
For HR directors and management
26 contracts change hands by 2028
When a contract changes operator, the plant keeps running: it is the teams that change employer. In principle, article L1224-1 of the French Labour Code transfers their employment contracts; management, for its part, is reshaped.
5 operator changes awarded
| Plant | Before | After | Effective | Source |
|---|---|---|---|---|
| Saint-Ouen-sur-Seine (93)Marché Syctom de 12 ans, 650 000 t/an | Paprec | Urbaser (Asterya) | 1 January 2026 | Reviews |
| Labeuvrière (62)Ancienne usine jusqu’en avril 2027, nouveau CVE en chantier | Veolia (Valnor) | Idex (Idénergies d’Artois) | 12 June 2026 | Reviews |
| La Veuve (51)Concession Syvalom de 125 mois, conclue le 27/02/2026 | Veolia | FCC Environnement | 2 August 2026 (planned) | Reviews |
| Chaumont (52)Concession SDED 52 de 129 mois, signée le 16/02/2026 | Veolia (SHMVD) | Paprec Énergies Nord | 1 November 2026 | Reviews |
| Pithiviers (45)DSP conclue le 26/02/2026, jusqu’au 31/12/2035 | Paprec | Veolia (Géval) | 23 November 2027 | Reviews |
16 contracts out to tender, winner not published
| Plant | Outgoing operator | New contract | Source |
|---|---|---|---|
| Reims (51)Concession CVE et réseau de chaleur, offres au 31/07/2026 | Veolia | 1er janvier 2027 | Reviews |
| Ludres (54)DSP portée par 15 autorités (Grand Nancy) | Veolia | 1er janvier 2027 | Reviews |
| Lons-le-Saunier (39)MPGP modernisation et exploitation, 12 ans | Veolia | 1er janvier 2027 | Reviews |
| Douchy-les-Mines (59)Marché d’exploitation SIAVED 2027 à 2029 | Paprec | 1er janvier 2027 | Reviews |
| Pontcharra (38)Contrat prolongé d’un an, suite non publiée | Idex | 1er janvier 2027 | Reviews |
| Carrières-sous-Poissy (78)MGP revamping et exploitation, 10 ans | Suez | 2026 ou 2027 | Reviews |
| Rillieux-la-Pape (69)Nouvel appel d’offres annoncé par la Métropole de Lyon | Suez | juin 2027 | Reviews |
| Échillais (17)Concession de 12 ans relancée le 16/10/2025 | Veolia | août 2027 | Reviews |
| Vedène (84)Revamping des 4 lignes et exploitation, 88 mois | Suez | 2027 | Reviews |
| Dunkerque (59)Concession de 18 à 20 ans, offres au 05/11/2026 | Paprec | 31 décembre 2027 | Reviews |
| Arques (62)Marché Flamoval de 84 mois, offres au 16/11/2026 | Veolia | 2027 | Reviews |
| Ouarville (28)Concession Sitreva jusqu’en 2042, avec une 3e ligne en option | Suez | 30 décembre 2027 | Reviews |
| Saint-Benoît-la-Forêt (37)Concession de 28 ans avec une nouvelle UVE | Paprec | non publiée | Reviews |
| Bègles et Cenon (33)Concession Bordeaux Métropole de 84 mois | Veolia | 1er janvier 2028 | Reviews |
| Briec (29)Assistance au renouvellement lancée en mars 2025 | Veolia | fin 2027 | Reviews |
| Besançon (25)Assistance au renouvellement du MGP lancée en avril 2026 | Engie | 2028 | Reviews |
And 5 contracts renewed with the same group (Antibes, Montereau-Fault-Yonne, Chavanod, Valserhône, Bayet). The details are in the Atlas.
06 · The projects
37 waste-to-energy plants and 17 SRF boiler plants
54 projects, 18 under construction
39 brownfields on existing sites (rebuild, new line, extension, major upgrade) and 15 greenfields, new plants on new sites. Each needs a full team before it starts up.
39 brownfields on an existing site
| Project | Type | Sponsor | Commissioning | Status |
|---|---|---|---|---|
| Labeuvrière (62)Nouvelle UVE de Labeuvrière | EfW | CA Béthune-Bruay Artois Lys Romane | 2027 (été) | chantier |
| Saint-Thibault-des-Vignes (77)Nouvelle UVE du SIETREM | EfW | SIETREM | 2031 (mars) | chantier |
| Ivry-sur-Seine (94)L'Interval (nouvelle UVE Ivry-Paris XIII) | EfW | Syctom | 2026 (novembre au plus tard) | essais |
| Taden (22)UVE de Taden (ligne reconstruite + L1bis) | EfW | SMPRB | 2027 (juin) | chantier |
| Pontmain (53)UVE de Pontmain (nouvelle ligne L1bis) | EfW | Département de la Mayenne | 2028 (L1bis), fin des travaux T1 2030 | chantier |
| Saint-Pantaléon-de-Larche (19)Nouvelle UVE du SYTTOM 19 | EfW | SYTTOM 19 | 2028 (novembre) | chantier |
| Limoges (87)Nouvelle UVE de Limoges | EfW | Limoges Métropole (entente avec SYDED 87 et Evolis 23) | 2029 | attribué |
| La Tronche (38)Nouvelle UIVE d'Athanor | EfW | Grenoble Alpes Métropole et six intercommunalités | 2029 (fin) | chantier |
| Toulouse (31)Nouvelle UVE de Toulouse-Mirail | EfW | Decoset | 2031 | attribué |
| Nantes (44)Nouveau CTVD de la Prairie de Mauves | EfW | Nantes Métropole et 7 collectivités | 2029 (valorisation énergétique), projet complet 2031 | attribué |
| Noyant-Villages (Lasse) (49)UVE de La Salamandre (seconde ligne) | EfW | SIVERT de l'Anjou | 2030 | attribué |
| Colombelles (14)UVE de Colombelles (3e ligne) | EfW | SYVEDAC et SEROC | non publiée | étude |
| Poitiers (86)Nouvelle UVE de Poitiers | EfW | Grand Poitiers pour un groupement d'autorités concédantes de la Vienne | non publiée | concertation |
| Lyon (69)Reconstruction de l'UTVE Lyon Sud | EfW | Métropole de Lyon | 2033 | étude |
| Saint-Benoît-la-Forêt (37)Nouvelle UVE de Saint-Benoît-la-Forêt | EfW | SMICTOM du Chinonais | non publiée | étude |
| Saint-André (974)Chaudière CSR de Bois-Rouge | SRF | Albioma Bois-Rouge | T4 2026 (1re combustion), janvier 2027 (réception) | chantier |
| Dombasle-sur-Meurthe (54)Dombasle Énergie (Solvay) | SRF | Solvay (client industriel) | reportée (délai prorogé par AP 2026-0112) | reporté |
| Laneuveville-devant-Nancy (54)Novasteam (Novacarb) | SRF | Novacarb, groupe Humens (client industriel) | 2026 (essais S2, non confirmée) | essais |
| Lannemezan / La Barthe-de-Neste (65)Neste Énergie Avenir (Arkema) | SRF | SVD 94 (100 % Dalkia), client Arkema | été 2026 (production nominale annoncée, non confirmée) | essais |
| Vitry-sur-Seine (94)Thermo-sur-Seine (réseau de chaleur parisien) | SRF | SEMOP du réseau de chaleur de Paris (Ville de Paris 34 %, CDC 15 %, Thermopôle 51 %) | 2031 | concertation |
| Sausheim (68)Reconstruction de l'UVE du SIVOM Mulhouse Sud Alsace | EfW | SIVOM Mulhouse Sud Alsace | 2033 | étude |
| Dijon (21)UVE de Dijon Métropole, nouvelle ligne | EfW | Dijon Métropole | 2029 (nouvelle ligne), 2030 (ligne rénovée), 2031 (fin) | chantier |
| Bayet (03)UVE de Bayet, 3e ligne de four | EfW | SICTOM Sud Allier pour 6 autorités concédantes | 2030 | attribué |
| Saint-Amour (39)Chaufferie CSR PRODIA | SRF | PRODIA / PROVALT | non publiée | étude |
| Blois (41)UVE de Blois, nouvelle ligne haut PCI (NLVE) | EfW | ValEco | exploitation de la ligne à partir du 01/10/2027 (avenant 7) | chantier |
| Le Sourn (56)UVE de Pontivy-Le Sourn, seconde ligne et captage de CO2 | EfW | SITTOM-MI | été 2026 (prévision du marché) ; captage CO2 à partir de 2027 | chantier |
| Vitré (35)Nouvelle UVE de Vitré (S3T'ec) | EfW | S3T'ec (Vitré-Fougères) | non publiée | attribué |
| Sète (34)UVE de Sète, nouvelle ligne | EfW | Sète Agglopôle Méditerranée | 31/12/2025 prévue, non confirmée | chantier |
| Rennes (35)UVE de Rennes Villejean, restructuration | EfW | Rennes Métropole | fin 2026 (réception des premiers déchets) | essais |
| Villers-Saint-Paul (60)UVE de Villers-Saint-Paul, 3e ligne | EfW | SMDO | 2025 (inaugurée le 25/09/2025) | en service |
| La Veuve (51)UVE de La Veuve, modernisation | EfW | SYVALOM | non publiée | attribué |
| Calce (66)UTVE Arc Iris de Calce, travaux d'évolution | EfW | SYDETOM 66 | non publiée | attribué |
| Metz (57)UVE de Metz, 3e ligne | EfW | Eurométropole de Metz (régie Haganis) | non publiée | étude |
| Ouarville (28)UVE d'Ouarville, 3e ligne (option) | EfW | SITREVA | non publiée | étude |
| Vedène (84)UVE de Vedène, revamping des 4 lignes | EfW | SIDOMRA | non publiée | étude |
| Carrières-sous-Poissy (78)CVE Azalys, revamping | EfW | Valoseine | non publiée | étude |
| Bègles (33)UVE de Bègles, rénovation | EfW | Bordeaux Métropole | non publiée | étude |
| Cenon (33)UVE de Cenon, rénovation | EfW | Bordeaux Métropole | non publiée | étude |
| Bayonne (64)UVEOR du pôle Canopia, modernisation | EfW | Bil ta Garbi | non publiée | étude |
15 greenfields a new plant on a new site
| Project | Type | Sponsor | Commissioning | Status |
|---|---|---|---|---|
| Macouria (973)UVE de Guyane (CACL) | EfW | CA du Centre Littoral (CACL) | 2028 | attribué |
| Tours (37)UVE de Tours Métropole (site non arrêté) | EfW | Tours Métropole Val de Loire, Touraine Propre | non publiée | étude |
| Saint-Pierre (974)Run'Eva, UVE de CSR de Pierrefonds | SRF | ILEVA | fin 2026 (non confirmée) | chantier |
| Neuvillette / Thenelles (02)Chaufferie CSR Tereos Origny | SRF | Tereos (client industriel) | 2027 | chantier |
| Brest (29)Centrale CSR Polder Guyot Énergies (Bunge) | SRF | Polder Guyot Énergies (Idex 51 %, Guyot Énergies 49 %) | 2027 | chantier |
| Feyzin (69)Chaufferie CSR de Feyzin (Val'Energy) | SRF | Suez RV France | non publiée | étude |
| Viriat (01)Chaufferie CSR du pôle de La Tienne (Organom) | SRF | Organom | 2029 | autorisé |
| Retiers (35)Chaufferie CSR UPER Retiers (Lactalis) | SRF | UPER Retiers (Séché) et Société Laitière de Retiers (Lactalis) | non publiée | étude |
| Grand-Couronne (76)Chaufferie CSR Chapelle Darblay | SRF | Grand-Couronne Énergies (opérateur Veolia) pour Fibre Excellence | non publiée | reporté |
| Istres (13)Chaufferie CSR IREN de La Grande Groupède | SRF | Suez RV France | non publiée | étude |
| Gueltas (56)Chaudière HPCI de l'écopôle de Gueltas | SRF | Suez R&V | non publiée | étude |
| Draguignan (site non publié) (83)Pôle de transition environnementale de la Dracénie | SRF | Dracénie Provence Verdon Agglomération (SEMOP) | S2 2028 | attribué |
| Lot-et-Garonne (47)Future UVE du Lot-et-Garonne (Valorizon) | EfW | Valorizon | non publiée | étude |
| Mayotte (976)Future UVE de Mayotte (SIDEVAM) | EfW | SIDEVAM 976 | non publiée | étude |
| Graulhet (81)Chaufferie CSR Tarn Énergie Circulaire | SRF | Tarn Énergie Circulaire (Engie Solutions) | non publiée | étude |
07 · The jobs
Who runs a waste-to-energy plant
Eight jobs, their 2026 salaries
Gross annual base salary, national basis, from entry level to senior. The ranges come from the single grid of the Volta 2026 Barometer.
Site / Plant Director
Runs the plant: safety, furnace availability, relations with the local authority, budget.
70 to 146 k€Moderate shortage
Operations / O&M Director
Oversees several sites or a contract, answers for performance to the public client.
60 to 132 k€Moderate shortage
O&M / Operations and Maintenance Manager
Keeps the lines available: technical shutdowns, boilers, turbine.
36 to 88 k€High shortage
Shift Supervisor / Operations Supervisor
Runs the plant around the clock, leading a shift team.
29 to 59 k€High shortage
Process Engineer
Combustion, flue gas treatment, energy efficiency.
35 to 70 k€
HSE / QHSE Manager
Operating permit, environmental inspections, emissions, workplace safety.
55 to 85 k€
Industrial Maintenance Technician
Mechanics, boilermaking, furnace grates, conveyors.
28 to 50 k€In short supply
Automation Technician
Control systems, combustion control, instrumentation.
30 to 50 k€In short supply
08 · Questions
8 questions
Questions about waste-to-energy plants
What is a UVE (waste-to-energy plant)?
A waste-to-energy plant (UVE, unité de valorisation énergétique) burns residual household waste, the part that cannot be recycled, and recovers the heat of combustion to produce steam, electricity or heat for a district heating network.
How many waste-to-energy plants are there in France?
116 waste-to-energy plants are in operation in France as of 12 October 2026, two of them overseas (Fort-de-France and Saint-Barthélemy). ADEME’s SINOE database lists 117: the Tronville-en-Barrois plant (Meuse) closed in 2024. The 107 plants whose capacity is proven by a permit or an inspection report total 14.6 Mt of waste per year.
What is the difference between a UVE and an incinerator?
It is the same installation. “Incinerator” or “UIOM” refers to the plant that burns waste; it is called a UVE when it recovers energy and meets the R1 performance threshold of Directive 2008/98/EC (energy efficiency of 0.65, or 0.60 for plants permitted before 2009).
Who operates waste-to-energy plants in France?
Veolia (33), Suez (31), Paprec (21), Idex (7), Urbaser (4), Séché (3), Engie (3), Dalkia (1), then FCC Environnement at La Veuve and the Zephire joint venture in Toulon. 7 plants are run in-house by the public authority and 4 by local public or semi-public companies. Veolia and Suez operate 64 of the 116 plants, 57% of capacity. Most plants belong to a local authority that contracts out operation through a concession or a service contract.
What is an SRF boiler plant?
A boiler that burns solid recovered fuel, prepared from sorting rejects, to supply steam to an industrial site or a heating network. 5 SRF boiler plants are in operation in France as of 12 October 2026, and 17 projects are identified.
How many waste-to-energy and SRF projects are under way?
54 projects: 37 waste-to-energy plants and 17 SRF boiler plants, 18 of them under construction or commissioning. 39 are brownfields, on an existing site (rebuild, new line, extension, major upgrade), and 15 are greenfields, new plants on new sites. Each needs an operations, maintenance and management team.
What happens to employees when a plant changes operator?
In principle, article L1224-1 of the French Labour Code transfers employment contracts to the new operator when the activity is taken over with its resources. The conditions are checked case by case. Between 2026 and 2028, 26 operating contracts are renewed, reassigned or out to tender: the Atlas lists them one by one.
Which jobs are hiring in waste-to-energy plants?
Site directors, operations and maintenance managers, shift supervisors, process engineers, HSE managers, maintenance and automation technicians. A plant runs continuously: operations are organised in shift teams.
09 · Method
How the Atlas is built
Method, sources and thanks
- Starting point: ADEME’s SINOE database (117 sites in operation), cross-checked with the lists published by operators.
- Each plant checked one by one: inspection reports and permit status on Géorisques, BOAMP and TED notices, the national business register, press releases and local press.
- A blind pass: four checkers without access to the map redid all 116 locations. Two disagreements out of 116, settled on the evidence.
- Result: 116 plants in operation, 115 with dated evidence, one attributed on a probable indication (Enoris’s shareholding in Massy).
- Capacities come from a permit or an inspection report from 2023 to 2026, for 107 of the 116 plants; the others are marked “n.c.”, never estimated. They are not the tonnage treated in a given year.
- Contract end dates are those in published notices. Marked “around” when deduced from the contract term; “not published” when no notice gives them.
- ADEME, SINOE database of waste treatment facilities
- Géorisques, classified installations: status and inspection reports
- BOAMP, concession, contract and award notices
- TED, Official Journal of the European Union (procurement notices)
- French business directory (national register)
- Directive 2008/98/EC on waste, Annex II (R1 criterion)
- French Labour Code, article L1224-1
This Atlas grew out of a map published on LinkedIn on 11 October 2026. Site directors and operators corrected it the same day; every correction was checked on the evidence before going in. Thanks to Stéphane Tlouzeau, Laura Hervelin, Yohan Chirat, Jean-Sébastien Jamet, and the readers who wrote in private.
An error, a contract awarded since? Write to us from the contact page : the page is corrected within the week.
Volta Executive · executive search in industry and energy
A plant to run, a team to build?
Site director, operations manager, shift supervisor: we headhunt managers for waste-to-energy, biomass and process industry plants.

