Search firm
nuclear
EPR2 programme, major refurbishment, decommissioning: the nuclear industry is looking for project and site directors who have already held these responsibilities, and who are in post. Volta Executive, founded by an engineer with an EDF background, approaches them directly, under an exclusive and confidential mandate.
They have entrusted us with hires
Why nuclear recruitment is so complex in 2025-2026 ?
Rare leadership profiles, almost all in post
Few project and site directors have run a unit outage, a major refurbishment site or a decommissioning project. They are in post, in demand, and do not read job adverts: a leadership hire in the sector goes through direct search.
The sector's projects
The programme of six EPR2 reactors (Penly, Gravelines, Bugey), the major refurbishment of the existing fleet, the decommissioning of the first units and the fuel cycle sites mobilise project and site leadership over long timescales.
The cost of a bad hire in nuclear
On a long-term project, a poorly filled leadership role is paid for in schedule and in a departure to replace. The assessment therefore focuses on results achieved, safety culture and team leadership, and every assignment includes a replacement guarantee of 3 months, extendable to 6.
Florian Beurtey worked at EDF before Safran. He knows nuclear clearances and safety culture, and personally assesses every finalist with practical, field-based questions.
Florian Beurtey, Founder of Volta Executive, ex-EDF, ex-Safran, Mines Saint-Étienne
The nuclear roles we recruit
From site director to key manager, with indicative pay ranges for 2025-2026.
| Role | Experience | Median | Senior | Top of market | Shortage | Shortlist |
|---|---|---|---|---|---|---|
| Power Plant Director / Nuclear Site Director | 20+ years | 130k€ | 160k€ | 200k€ | ●●●●● | Within 10 days |
| Nuclear Technical Director | 15+ years | 95k€ | 120k€ | 145k€ | ●●●●● | Within 10 days |
| EPR2 / SMR Project Manager | 12+ years | 90k€ | 110k€ | 135k€ | ●●●●● | Within 10 days |
| Nuclear Safety Engineer | 8+ years | 60k€ | 78k€ | 95k€ | ●●●●● | Within 10 days |
| Radiation Protection Manager | 5 years+ | 52k€ | 68k€ | 80k€ | ●●●●● | Within 10 days |
| Decommissioning Engineer | 7+ years | 55k€ | 72k€ | 88k€ | ●●●●● | Within 10 days |
| Power Plant Shift Leader | 10+ years | 58k€ | 72k€ | 85k€ | ●●●●● | Within 10 days |
| Fuel Cycle Engineer (Orano) | 5 years+ | 50k€ | 65k€ | 78k€ | ●●●●● | Within 10 days |
| Nuclear Maintenance Manager | 8+ years | 58k€ | 74k€ | 88k€ | ●●●●● | Within 10 days |
| Civil / Structural Engineer | 5 years+ | 48k€ | 62k€ | 75k€ | ●●●●● | Within 10 days |
Data from our 2023-2025 assignments · Volta Executive
Leadership assignments led by Volta Executive
Operations director and two site directors
FilledEnergy transformation programme
Confidential, under NDA
€200m programme
Published assignment, details in the client case
Site director, SRF cogeneration
FilledEnergy recovery · Guyot × IDEX
Brest, Brittany
Offer accepted on day 25
Published assignment, details in the client case
Plant director and deputy director, EfW
FilledEnergy recovery · IDEX
Villers-Saint-Paul, Hauts-de-France
345 executives approached
Published assignment, details in the client case
Quality director, executive committee member
FilledBESS · power conversion · NIDEC
France
Executive committee
Published assignment, details in the client case
Our executive search method in nuclear
Technical scoping
A 1-hour scoping session with the future manager and you (MD, HR director, CFO), and a scorecard. We speak the same language as your technical teams: nuclear clearances, safety culture, fuel cycle.
Mapping & direct search
Mapping of the search ecosystem within our network of 18,000 industry & energy professionals. Discreet approach to people in post at EDF, Orano, Framatome, Assystem. No public advert, no CV database.
Nuclear skills assessment
Nuclear-specific technical assessment grid: safety skills, clearances, reactor experience, ASN culture. Presentation of 3 to 5 finalists within 10 days, hire within 3 weeks.
Integration & 90-day follow-up
Support through to day 90 in the role, regular check-ins with the executive hired and their manager. 3-month replacement guarantee, extendable to 6. 96% success rate over 120 assignments analysed between 2023 and 2025, Volta Executive and previous firms.
Every finalist is assessed by Florian Beurtey, ex-EDF, a Mines Saint-Étienne and AgroParisTech engineer, who knows the safety culture from the inside.
Why Volta Executive rather than a generalist firm?
| Criterion | Volta Executive | Generalist firm |
|---|---|---|
| Nuclear technical knowledge | Ex-EDF, safety culture mastered | Varies by firm |
| Sector network | +18K industry & energy professionals | Varies by firm |
| Recruitment method | Direct search, exclusive mandate | Adverts + CV database, most often |
| Technical assessment | Nuclear-specific technical grid | Varies by firm |
| Guarantee | Replacement 3 to 6 months, 90-day follow-up | Varies by firm |
| Lead time | Shortlist within 10 days, hire within 3 weeks | 12 weeks on average for a manager, all methods (Apec 2025) |
Our other recruitment areas
Frequently asked questions · Nuclear recruitment firm
How much does a specialist nuclear recruitment firm cost?
What is the difference between direct search and a job advert in nuclear?
Does Volta Executive recruit outside Paris and Île-de-France for nuclear?
What are your lead times for a rare nuclear role?
How does a nuclear assignment work with Volta Executive?
Which roles do you recruit in nuclear?
Do you offer a guarantee if the executive hired leaves the role?
One leadership role in nuclear?
A confidential 30-minute conversation with Florian Beurtey, on the role, the timeline and the package.
Assign us a mandateExclusive mandate · Confidential conversation
